Trigger
An MES station calls material to the assembly takt, or shortage, wrong material, quality hold or design change invalidates the existing delivery task.
SCENARIO-DETAIL / LOCALIZED DECISION BRIEF
Business trigger: An MES station calls material to the assembly takt, or shortage, wrong material, quality hold or design change invalidates the existing delivery task.
REFERENCE_ARCHITECTURE · READBACK_VERIFY
Confirm source, Truth and maximum action boundary before moving it into a fixed-field comparison.
Review the reference architecture only. This page does not connect systems, execute actions or present a candidate as deployed.
Only the current scenario ID enters the comparison view; no direction is saved and no pilot is submitted automatically.
REFERENCE_ARCHITECTURE · READBACK_VERIFY · REFERENCE SUPPORT ONLY · NO PRODUCTION CONNECTION · NO CUSTOMER EFFECT CLAIM
DECISION RECORD / C.24
Source-traceable reference · pp.52–53
An MES station calls material to the assembly takt, or shortage, wrong material, quality hold or design change invalidates the existing delivery task.
Use equipment serial, work order, BOM version and quality state to support scannable, receipted staging, picking, delivery and line-side acceptance.
Do not generate picking when BOM version, serial or quality state conflicts. A wrong-material scan immediately freezes the delivery and preserves physical and system evidence.
The call binds a work order and serial; version and quality checks pass; picking and delivery are traceable; line-side receipt is scanned; WMS and MES quantities agree.
Choose one assembly station and establish the call key, BOM version, scan evidence and line-side readback.
KNOWLEDGE → COMPARISON → DIRECTION → OPTIMIZATION
The full-detail canonical evidence record remains available in Chinese. IDs, Truth classes, boundaries, and source references stay unchanged across languages.
Source-traceable reference
Compare the same operating fields before choosing a direction.
Confirm the owner, authority, human gate, and readback rule.
Define a baseline, target, owner, and observation window before claiming impact.