Skip to main content
STAREVIDENCE OS · ENTERPRISE AGENT DECISION PATHPrepare a pilot

SCENARIO-DETAIL / LOCALIZED DECISION BRIEF

Assembly Material Call to Line-side Delivery

Business trigger: An MES station calls material to the assembly takt, or shortage, wrong material, quality hold or design change invalidates the existing delivery task.

REFERENCE_ARCHITECTURE · READBACK_VERIFY

Evidence chain for Assembly Material Call to Line-side Delivery, connecting sources, human gates, governed actions and formal readback
case.C.24 · EVIDENCE COMMAND CANVASSTAR v4.2

DECISION RECORD / C.24

What this route helps you decide

Source-traceable reference · pp.52–53

01

Trigger

An MES station calls material to the assembly takt, or shortage, wrong material, quality hold or design change invalidates the existing delivery task.

02

Goal

Use equipment serial, work order, BOM version and quality state to support scannable, receipted staging, picking, delivery and line-side acceptance.

03

Risk / exception

Do not generate picking when BOM version, serial or quality state conflicts. A wrong-material scan immediately freezes the delivery and preserves physical and system evidence.

04

Close condition

The call binds a work order and serial; version and quality checks pass; picking and delivery are traceable; line-side receipt is scanned; WMS and MES quantities agree.

05

Next safe action

Choose one assembly station and establish the call key, BOM version, scan evidence and line-side readback.

KNOWLEDGE → COMPARISON → DIRECTION → OPTIMIZATION

Evidence stays attached to the decision.

The full-detail canonical evidence record remains available in Chinese. IDs, Truth classes, boundaries, and source references stay unchanged across languages.

01

Knowledge

Source-traceable reference

02

Comparison

Compare the same operating fields before choosing a direction.

03

Direction

Confirm the owner, authority, human gate, and readback rule.

04

Optimization

Define a baseline, target, owner, and observation window before claiming impact.

NEXT STEP / TASK ROUTE

Continue on the same decision route

PAGE ID

case.C.24

TRUTH

REFERENCE_ARCHITECTURE

REFERENCE ARCHITECTURE · NO SILENT TRUTH PROMOTION · NO PRODUCTION CLAIM